
How secure are your businesses passwords?

Swine Flu - Adieu!

Centric Systems install wireless network for the London Continental Hotel

Maidenhead, U.K. – September 26, 2008 - Centric Systems Ltd, an IT solutions provider has completed a regional office move Building Management System Integrators Ltd.
Centric Systems were contacted by BMSi Ltd to plan and assist with the move of their regional office in Hove, East Sussex. Centric Systems attended the new office location to asses what was necessary for the office move to take place as seamlessly as possible. We then liaised directly with Easynet to ensure that the current communications platform would be moved of the planned date to ensure minimum downtime to operations. Additionally, Centric Systems engineers were present to relocate all hardware and confirm working operations at the new location
Mandy Rogers of BMSi Ltd adds “Given the short notice we gave Centric Systems on the date of our office re-location, they stepped up to the challenge and took it all in their stride and once again did an outstanding job. Considering the minimum time given to prepare, the move went really smoothly – with minor snags being easily overcome and the end result showed on Monday morning, when our IT network fired up with no hitches or down time lost. Our grateful thanks to the Centric team.”
Abbos Azad from Centric Systems comments “The date for the move had already been set so we were immediately against the clock to get things moving swiftly. Easynet were fast to act upon our communication and without their fast action at short notice the move could have left the client without Internet access for a number of days. The project was well planned and executed which resulted in less than 6 hours of downtime. For such a busy office, timing was impeccable.”
For further information please contact:-
news@centricsystems.co.uk or call 0845 2266031